top of page
Search

Textile Museum at Paithan

  • a19tanuja
  • Feb 21, 2022
  • 2 min read

Updated: Apr 18, 2022

The process began by asking ourselves the ontological question- What is a Museum?

A museum according to my understanding is A place of Observation and Viewing- very occulocentric in nature.

A space of Learning which generates curiosity and becomes a Tourist Attraction as it highlights a part of the culture of that place. It becomes a Centre to preserve a culture/ a practice/ an art - passed down from generations and hence has the Responsibility to attract people to support/help in conservation of the craft


A ziggurat is a Mesopotamian temple- with a staggered form tapering as it goes higher







My initial idea came from trying to make the exhibit spaces to be interactive and to be able to look into each other in order to generate curiosity

And then further as the brief specified that we all need a g+3 structure , i did not want to make a linear floor like arrangement so then the idea of a ziggurat which is a mesopotamian temple - so it involves stacking but in a tapering manner so the area of the spaces keep decreasing as you go up and that also creates like these balcony spaces which become buffer between open and closed spaces which is a necessity in the hot and dry climate of paithan.











Initial Massing experiments in the form of Ziggurat- according to areas allotted to each space

















the entrance is from the South West and the parking is towards the Northern edge of the site

As one enters there is the entrance foyer and all 2 exhibits on the ground level and the other two on the upper levels.


The museum cafe and kitchen and admin is towards the north west and like one can access these spaces through semi open corridors .

The staircases are somewhat at an exterior to each building but have entry from inside

Lift has been provided only for the exhibition building so far




Plans in process.


 

A Process


Foundation Plan


Setting Out plan


Site Development plan


Ground Floor Plan

FOUNDATION STEPS- in process








 

Process Drawings of Week 4 and 5


More time was given to section and elevation drawings this week.











 

Complete Portfolio of Drawings. Plans yet to be refined and uploaded anew.






















 


 
 
 

Kommentarer


© 2023 by Name of Site. Proudly created with Wix.com

bottom of page